86exporter.com Home       Products Catalog      Suppliers Catalog      Log In        Sign up
      About Us
      Profile
      Products
      Contact Us


WUXI KOMAY ELECTRIC EQUIPMENT CO***NY

Products >> Copperhead_Conductor_Systems_200A_3000A

Copperhead_Conductor_Systems_200A_3000A

Build Your Online Product Catalogs?



Description
Product Name: Copperhead_Conductor_Systems_200A_3000A
Supply Ability:
Related proudcts conductor system,
Specifications JGH/300A-3000A
Price Term:
Port of loading:
Minimum Order
Unit Price:

***ailed Product Description


Copperhead Conductor Systems 200A-3000A /High-current/High-voltage/High temperature tolerance


Copperhead Conductor Systems are used for high-temperature, high dust, high corrosion, and other adverse circumstances.Superb quality of heavy duty of bimetallic (copper & steel) crane bar, of which the rated current ranges from 300 amperes up to 3,000 amperes enough to satisfy all the capacity for cranes running especilly at iron & steel mills, heavy industrial plants, etc.., which are exposed to extremely high temperature duing operation.






Standard application data

Nominal Current (at 100% duty cycle) [A]: 300 - 500 - 800 - 1000 - 1500 - 2000 - 3000

Nom. Voltage [V]: 600-3000 (with add. insulators)

Rail Length [mm]: 6.000

Weight(kg):24 - 26 - 30 - 36 - 51 - 72 - 120

Operating Conditions: for indoor and weather protected outdoor applications

Track Configuration: straight / easy onside adaptation to course layout



A complete set of 6 meter copper headed steel rail crane bar:
To consist of copper headed steel rail crane bar (trolley bar / bus bar), Joint keeper, Joint cover, Expansion section, Hanger clamp with insulator, Power feeder, Locating clamp, Pantograph collector, etc.

***ailed specifications and photos of each component are available upon request.







Maintenance

--After installation,Make sure that the sliding hangers are straight (in a perpendicular position) after nuts have been tightened to guarantee free sliding of the powerail.The powerail must be installed exactly straight and parallel to the machinery track.

--Before running the powerail,Check the system for esay running of the current collector trolleys,i.e.there may be no resistance by an excessively narrow slot or pull by the connecting cable.

--Every 3 up to max.12 months,-depending on the frequency of operation and travel distance-,check the carbon brushes and mechanical componets for wear and replace them if necessary.

Contact Us
Company: WUXI KOMAY ELECTRIC EQUIPMENT CO***NY
Contact: Mr. Yin SuMin
Address: Chunlei,Xishan Economic Development Zone,Wwuxi,Jiangsu
Postcode: 214101
Tel: 13812069587
Fax: 86-510-88266895
E-mail:         


Copyright© WUXI KOMAY ELECTRIC EQUIPMENT CO***NY All Rights Reserved.
Tel : 13812069587 Fax : 86-510-88266895
Powered by 86exporter.com